CLIENT: NISOC
FEED GAS: 30 MMSCFD
NATURAL GAS RECOVERY: 23 MMSCFD
CONDENSATE RECOVERY: 430 TON/DAY
INSTALLED COMPRESSOR: 16 SET
CONSTRUCTION PERIOD: 2019-2020
OPERATION START: 2021